Work under this project consists of installing new watermains and domestic services at the following locations in Campbell River. The existing services are connected to old, undersized watermains which have reached the end of their useful service life.
- Cedar Street at 9th Avenue is completed
- Fir Street (9th to 12th Avenue) in 2019
- Garfield/Painter/Pengelly Roads in 2019
- Perkins/Effie Joy Roads
- Hilchey Road
The first location for replacement was on Cedar Street and included the renewal of 150 mm diameter PVC watermain from 9th Avenue northward to the end of the cul de sac. In general terms, the work included the installation of a new watermain, services, hydrant and miscellaneous appurtenances and reinstatement of the entire road surface.
Work on Fir Street (between 9th and 11th Avenues) and Garfield, Painter and Pengelly Roads will commence in 2019.